Galhor — Shipping & Delivery Policy 

At Galhor, shipping times are divided into two separate phases:

  1. Galhor Processing Time — the time we take to manufacture, prepare, and dispatch your order.

  2. Carrier Transit Time — the time the shipping company takes to deliver the order to your address.

These two timeframes together make up the full delivery time:

TOTAL DELIVERY TIME = Galhor Processing Time + Carrier Transit Time


1. Manufacturing & Processing — Stainless vs Carbon Steel

Galhor manufactures all bumpers in-house, including stainless steel products.
Nothing is pre-bought, pre-made, or outsourced.
The difference in delivery times is due to our internal production structure:

  • Stainless steel programs (The Fastest / The Shiniest) have priority manufacturing lanes, dedicated stock of raw material, and streamlined finishing lines.
    → Por eso salen en 1 día, pero siguen siendo fabricados por nosotros, no comprados listos.

  • Carbon steel (The Standard) is made-to-order and follows a full manufacturing workflow with longer scheduling.


2. Shipping Methods by Product Type

Flat Bumpers
  • Shipped via UPS.

  • UPS handles final delivery to your address.

  • Typical transit: 3–7 business days (U.S.)

Wrap-Around Bumpers
  • Shipped via LTL freight due to their size and depth.

  • Transit time: 5–10 business days, depending on location.


3. Processing Times by Material & Program

A. Stainless Steel — “The Fastest” & “The Shiniest”

Galhor manufactures these items internally using a priority production workflow:

  • Processing Time (Galhor):
    1 business day after order/payment confirmation.
    (Fast because the production line and raw stainless inventory are already prepared—not because the product is pre-made.)

  • Carrier Transit Time:

    • UPS (flat): 3–7 days

    • LTL (wrap-around): 5–10 days

Total Estimated Delivery:
7–12 business days, depending on destination and carrier.


B. Carbon Steel — “The Standard” (Made-to-Order Manufacturing)

These bumpers require a full production cycle:

  • Cutting

  • Forming

  • Welding

  • Grinding & finishing

  • Quality inspection

  • Processing Time (Galhor): 4 to 6 weeks

  • Carrier Transit Time:

    • UPS: 3–7 days

    • LTL: 5–10 days

Total Estimated Delivery:
5 to 7 weeks, depending on order volume and freight distance.


4. Important Clarifications

  • We manufacture all stainless steel bumpers in-house.
    Fast turnaround does not mean pre-made or purchased.
    It means we maintain dedicated stainless production capacity.

  • Carrier transit times are the responsibility of UPS or the LTL freight company.
    Weather, reroutes, or delays outside Galhor’s control may affect final delivery.

  • Any address changes, delivery appointments, or special freight requirements must be handled with the carrier once the order has shipped.


5. Summary Table (Updated with Manufacturing Clarity)

Program / Material Product Type Who Manufactures It Galhor Processing Time Carrier Transit Time Total Estimated Delivery
The Fastest (Stainless) Flat Manufactured by Galhor 1 day UPS: 3–7 days ~7–10 days
The Fastest (Stainless) Wrap-Around Manufactured by Galhor 1 day LTL: 5–10 days ~7–12 days
The Shiniest (Stainless) Any Manufactured by Galhor 1 day UPS/LTL ~7–12 days
The Standard (Carbon Steel) Flat Manufactured by Galhor (Made to Order) 4–6 weeks UPS: 3–7 days ~5–7 weeks
The Standard (Carbon Steel) Wrap-Around Manufactured by Galhor (Made to Order) 4–6 weeks LTL: 5–10 days ~5–7 weeks