Galhor — Shipping & Delivery Policy
At Galhor, shipping times are divided into two separate phases:
-
Galhor Processing Time — the time we take to manufacture, prepare, and dispatch your order.
-
Carrier Transit Time — the time the shipping company takes to deliver the order to your address.
These two timeframes together make up the full delivery time:
TOTAL DELIVERY TIME = Galhor Processing Time + Carrier Transit Time
1. Manufacturing & Processing — Stainless vs Carbon Steel
Galhor manufactures all bumpers in-house, including stainless steel products.
Nothing is pre-bought, pre-made, or outsourced.
The difference in delivery times is due to our internal production structure:
-
Stainless steel programs (The Fastest / The Shiniest) have priority manufacturing lanes, dedicated stock of raw material, and streamlined finishing lines.
→ Por eso salen en 1 día, pero siguen siendo fabricados por nosotros, no comprados listos. -
Carbon steel (The Standard) is made-to-order and follows a full manufacturing workflow with longer scheduling.
2. Shipping Methods by Product Type
Flat Bumpers
-
Shipped via UPS.
-
UPS handles final delivery to your address.
-
Typical transit: 3–7 business days (U.S.)
Wrap-Around Bumpers
-
Shipped via LTL freight due to their size and depth.
-
Transit time: 5–10 business days, depending on location.
3. Processing Times by Material & Program
A. Stainless Steel — “The Fastest” & “The Shiniest”
Galhor manufactures these items internally using a priority production workflow:
-
Processing Time (Galhor):
1 business day after order/payment confirmation.
(Fast because the production line and raw stainless inventory are already prepared—not because the product is pre-made.) -
Carrier Transit Time:
-
UPS (flat): 3–7 days
-
LTL (wrap-around): 5–10 days
-
Total Estimated Delivery:
7–12 business days, depending on destination and carrier.
B. Carbon Steel — “The Standard” (Made-to-Order Manufacturing)
These bumpers require a full production cycle:
-
Cutting
-
Forming
-
Welding
-
Grinding & finishing
-
Quality inspection
-
Processing Time (Galhor): 4 to 6 weeks
-
Carrier Transit Time:
-
UPS: 3–7 days
-
LTL: 5–10 days
-
Total Estimated Delivery:
5 to 7 weeks, depending on order volume and freight distance.
4. Important Clarifications
-
We manufacture all stainless steel bumpers in-house.
Fast turnaround does not mean pre-made or purchased.
It means we maintain dedicated stainless production capacity. -
Carrier transit times are the responsibility of UPS or the LTL freight company.
Weather, reroutes, or delays outside Galhor’s control may affect final delivery. -
Any address changes, delivery appointments, or special freight requirements must be handled with the carrier once the order has shipped.
5. Summary Table (Updated with Manufacturing Clarity)
| Program / Material | Product Type | Who Manufactures It | Galhor Processing Time | Carrier Transit Time | Total Estimated Delivery |
|---|---|---|---|---|---|
| The Fastest (Stainless) | Flat | Manufactured by Galhor | 1 day | UPS: 3–7 days | ~7–10 days |
| The Fastest (Stainless) | Wrap-Around | Manufactured by Galhor | 1 day | LTL: 5–10 days | ~7–12 days |
| The Shiniest (Stainless) | Any | Manufactured by Galhor | 1 day | UPS/LTL | ~7–12 days |
| The Standard (Carbon Steel) | Flat | Manufactured by Galhor (Made to Order) | 4–6 weeks | UPS: 3–7 days | ~5–7 weeks |
| The Standard (Carbon Steel) | Wrap-Around | Manufactured by Galhor (Made to Order) | 4–6 weeks | LTL: 5–10 days | ~5–7 weeks |